Installation of the photovoltaic roof of the San Rafael II Farm

After the execution of the first self-consumption photovoltaic installation at Granja San Rafael in 2019, Irradia Energía completes the work on a second installation in the new Granja San Rafael warehouses in Marchena.

The annual production of the new Granja San Rafael II facility will be 126,015 kWh/year with a peak power of 84.15kWp, using 153 modules of 550Wp each.

In this way, Irradia Energía and Granja San Rafael continue to contribute to a sustainable energy transition by reducing CO2 consumption.

Leave a Reply

Your email address will not be published. Required fields are marked *

Post comment