Irradia Energía is actively working on the commissioning of the San Jorge Solar Park (24 MWp).

The San Jorge Solar Park located in Extremadura, like its “brother” Burguillos, consists of a total of 6 transformer stations (TC) composed of GPTech PV inverter model WD3, MV transformer and cell. Irradia’s technical specialists, together with GPTech, have been in charge of the commissioning of the PV inverters, checking the correct wiring of the…

Leer el artículo

Irradia Energía renews its vehicle fleet

Irradia Energía renews its fleet of vehicles in order to facilitate the daily work of its field technicians. Irradia Energía starts a process of fleet renewalIn this opportunity we have opted for two vehicles with different approaches, one capable of driving in rough terrain(Ford RANGER pickup)and another with the ability to load all the necessary…

Leer el artículo