Alonsolar Morón Solar Park: Promotion, Engineering and Execution

Alonsolar Morón Solar Park: Promotion, Engineering and Execution Moron de la Frontera – Seville Irradia Energía is carrying out the complete development of the project, which includes the engineering, development, commercialization and construction of a 2.1 MWp solar farm located in Morón de la Frontera (Seville). Construction began in February 2008 and connection was made…

Marchena Solar Park: Promotion, Engineering and Execution

Marchena Solar Park: Promotion, Engineering and Execution Marchena – Seville 540 kWp Irradia Energía carries out the complete development of the project, including engineering, development, commercialization and construction. Construction began in June 2008 and connection was made in September 2008. The solar farm has a capacity of 540 kWp and is located in Marchena (Seville).

Aguilar Solar Park: Development, Engineering and Execution

Aguilar Solar Park: Development, Engineering and Execution Escacena del Campo – Huelva Technology: Fixed 2100 kWp Irradia Energía carries out the complete development of the project, which includes the engineering, development, commercialization and construction of a photovoltaic solar park in Escacena del Campo (Huelva). Construction began in November 2007 and the park was connected in…

Alcalá del Río Solar Park

Alcalá del Río Solar Park: Engineering, processing and construction management. Alcalá del Río – Seville Irradia Energía carries out the complete development of the project, including engineering, development, commercialization and construction. Construction began in June 2008 and connection was made in September 2008. The solar farm has a capacity of 540 kWp and is located…

R+D+i Project: Clima FV

R+D+i Project: Clima FV This project was initiated at the beginning of 2013 and consists of the development of an air conditioning system with electrical energy from photovoltaic modules. These off-grid installations are very interesting in certain homes or enclosures where their location or demand profile makes them profitable, due to the savings obtained in…

R+D+i Project: PV Ontime

R+D+i Project: PV Ontime PV ON-TIME aims to achieve the experimental development of a new prototype based on an intelligent system for the production, management, control and storage of on-time electrical energy that incorporates a sensor network and advanced telecommunications, aimed at large photovoltaic plants, both nationally and internationally. This intelligent system will have the…

Energy audit of the thermal installations of the municipal swimming pool of Castilleja de la Cuesta.

Energy audit of the thermal installations of the Castilleja de la Cuesta municipal swimming pool. Castilleja de la Cuesta – Seville Preparation of a technical report on the operating conditions of the hot water production facility. for the Municipal Indoor Swimming Pool, diagnosing operating problems and verifying whether the project, technical management and execution of…