Installations of the new development “Aedas Sancti Petri”.

Installations of the new development "Aedas Sancti Petri". Irradia Energía has collaborated with the architectural firm Lamela in the execution project for 206 homes in Sancti Petri, Chiclana de la Frontera (Cádiz). The Developer Aedas Homes embarks on this ambitious project that includes 180 multi-family homes and 26 single-family homes, in addition to a large…

Leer el artículo

Breeam Certificate of the former Cruzcampo factory (Seville)

Breeam Certificate of the former Cruzcampo factory (Seville) Irradia Energía collaborates with Elecnor to obtain the Breeam certificate for the construction of the former Cruzcampo factory. The renovation of the two main buildings (Mosaic and Palomar) will convert the emblematic brewery into a Beer Museum. The Mosaico building will house the Cruzcampo Space, conceived as…

Leer el artículo